Page 59
Fresenius 2008
®
K Calibration Procedures
P/N 507296 Rev D
8. The machine is now adjusting to a second reference point of conductivity
for the post conductivity cell. When the conductivity is stable again, the
screen will change.
Press the [CONFIRM] key to save the data. The screen will change.
Disconnect the conductivity meter and replace the dialysate lines in the shunt.
Press the [CONFIRM] key to complete the calibration and return to the
Calibrate Sensors screen.
2.3.8.2 CONDUCTIVITY CELLS CALIBRATION (v2.25 or greater)
Machines equipped with Online Clearance (OLC) have two conductivity cells.
The first conductivity cell is PRE dialyzer and the second conductivity cell is
POST dialyzer.
Note: If the Clearance option is set to NO in Hardware Options, the post
conductivity cell will not be calibrated.
From the Calibrate Sensors screen, select the Cond Cells screen button. The
screen will change to the following: