1. Stop the operation, and turn off the all outdoor units.
1-1. Backup operation when compressor of the master unit is defective.
[Procedure]
(Example: Three outdoor units are connected.)
2. Fully shut off the 3-way valve (Liquid, High pressure gas, Low pressure gas) of the broken master unit.
3. Set the Slave unit #1 as a new master unit, and make up the system of two outdoor units.
5. Uncouple the transmission connector between the broken master unit and indoor units,
and connect it into the slave unit #1 (substitutional master unit).
7. Turn on the units except the broken master unit, and wait for more than 30 seconds.
(Do not turn on the broken master unit)
8. It is ready for Backup operation.
Start operation as usual.
1. Method of backup operation
SERVICE INFORMATION
Backup Operation
4-4 SERVICE INFORMATION
Backup operation is the operating method of replacing compressor while the system is running.
Compressor can be replaced without stopping the system.
Details :
In backup operation, cooling and heating capacity is decreased by the capacity
of the separated outdoor unit.
The work procedure is as follows.
Change the setting of the DIP SW 3-1 / 3-2 (Outdoor unit address setting) of the slave
unit #1, from [ ](slave unit #1) to [ ]( Master unit ).
Change the setting of the DIP SW 3-3 / 3-4 (Number of slave units connected setting)
of the slave unit #1, from [ ](zero unit) to [ ](one unit).
6. Change the setting of the DIP SW 5-1/ 5-2 (Number of outdoor unit) of the slave unit #1 (substitutional
master unit) and #2 (substitutional slave unit #1), from [ON/ OFF](3) to [OFF/ ON](2).
4. Set up the Slave unit #2 as the slave unit #1.
Change the DIP SW 3-1/ 3-2 (Outdoor unit address setting) of the slave unit #2,
from [ON/ OFF](slave unit #2) to [OFF/ ON]( Slave unit #1 ).
4-4-1 Backup operation
OFF / ON OFF / OFF
OFF / OFF
OFF / ON
( Make sure the pressure equalization has been finished.)
04-91

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu Airstage VR-II ASUB24TLAV and is the answer not in the manual?

Fujitsu Airstage VR-II ASUB24TLAV Specifications

General IconGeneral
BrandFujitsu
ModelAirstage VR-II ASUB24TLAV
CategoryAir Conditioner
LanguageEnglish

Related product manuals