PACE Pressure Controller User Manual
[EN] English 4 - 1 K0443 Revision A
4 Maintenance
4.1 Introduction
This section contains the routine maintenance and procedures to replace components (Ref:
Section 5, Testing and Fault Finding) and listed (Ref: Table 4.2).
Table 4.1 - Maintenance Tasks
* may change depends on usage (e.g., rack mounted, bench top) and environment (e.g., humidity, dust).
† may change depends on the required accuracy.
4.2 Visual Inspection
Inspect for obvious signs of damage and dirt on the following:
a.External of the instrument.
b.Power supply connector and power lead.
c.Associated equipment.
Damaged parts must be replaced contact GE Service.
4.3 Cleaning
Caution
Do not use solvents for cleaning.
Clean the front panel with a damp lint-free cloth and mild detergent.
4.4 Test
Do a standard serviceability test (Ref: Standard Serviceability Test, Section 5.2).
Task Period
Visual Inspection Before use
Cleaning Weekly*
Test Before use
Calibration 12 months †
Pressure Module filters Determined by usage.
Replace Pressure Mod-
ule
Pressure controller operating
hours.