UDACT Instruction Manual — P/N 50050:M 12/18/2009 105
Point Assignments AM2020/AFP1010 (UL 8th)
Below is an internal installation of a UDACT with an AM2020/AFP1010 using an MPS-24B main
power supply:
Figure H.2 UDACT and AM2020/AFP1010 with MPS-24B
H.4 Point Assignments
Use the following charts to carefully identify the function of each point in the system. Take special
precaution with any supervisory points in the system. For the UDACT to report a supervisory point
to the central station, both the FACP and the UDACT must have the point programmed as
supervisory. Failure to program the panel or UDACT correctly will result in a fire alarm signal
being transmitted to the central station. All points greater than 568 can only be transmitted as fire
alarm points. Use Type Mode (refer to "Type Mode" on page 52) to match the function of points in
the system for proper reporting.
EARTH
Comm FAILURE
+24V
+24V
GND
RS+
RS–
SHIELD
RS+
Rs–
ACS/TERM
TERM
COMMONCOMMON
BATT -
+24V POWER+24V RESET
BATT +
To Phone Lines
(supervised)
Connect to CHS-4
Chassis
MPS-24B
SIB-2048
EIA-485
Interface
DO NOT USE
UDACT-16.cdr