EasyManuals Logo

Huawei TaiShan 200 2280 User Manual

Huawei TaiShan 200 2280
209 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #85 background imageLoading...
Page #85 background image
Step 1 Install the oating nuts.
1. Determine the installation positions according to the cabinet device
installation plan.
Floating nuts are used to tighten screws.
The spacing boundary is used as the reference for calculating device installation space.
See Figure 5-3.
Figure 5-3 Spacing of 1U on a mounting bar of a cabinet
2. Fasten the lower end of a oating nut to the target square hole in a
mounting bar at the front of the cabinet.
3. Use a
oating nut hook to pull the upper end of the oating nut, and fasten
it to the upper edge of the square hole. See Figure 5-4.
Figure 5-4 Installing a oating nut
TaiShan 200 Server
Maintenance and Service Guide (Model 2280) 5 Removal and Installation
Issue 04 (2020-01-16) Copyright © Huawei Technologies Co., Ltd. 78

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei TaiShan 200 2280 and is the answer not in the manual?

Huawei TaiShan 200 2280 Specifications

General IconGeneral
BrandHuawei
ModelTaiShan 200 2280
CategoryServer
LanguageEnglish

Related product manuals