Repair
Charge air system
3.9 Charge air system
3.9.1 Air intake line removal and installation
Previous tasks
Not applicable.
Specific safety instructions
Not applicable.
Special tools
Not applicable.
Consumables and equipment
– Vaseline
– Rags
Overview
Fig. 150: Task overview
1
Charge air pipe – end segment (B bank) 7 Screw (M10)
2 O-ring 8 Screw plug
3 Pipe 9 Connection piece
4 Charge air pipe – middle segment (B
bank)
10 O-ring
5 Gasket 11 Screw plug
6 Screw (M10)
KD62V12 33525088601_8_1 EN_US
2022-09
© 2022 by Kohler Co. All rights reserved.
139