3-63
PC130/150LGP-6K ENG
24. SERVICE PROCEDURE
24.9 EVERY 2000 HOURS SERVICE
Maintenance for every 100, 250, 500 and 1000 hours should be
carried out at the same time.
24.9.1 CHECK OIL LEVEL IN PTO GEAR CASE, ADD
OIL
Immediately after operations, the oil is at a high temperature.
Wait for the temperature to go down before starting this opera-
tion
1. Swing the upper structure so that the PTO gear case is midway be-
tween the left and right tracks.
Stop the engine and set the safety lock lever to the LOCK positon.
2. Remove the cover under the right side of the machine.
3. Remove plug and check that the oil level is close to the bottom
edge of the plug hole. If the oil level is low, remove plug , and add oil
through the hole of plug until it reaches the bottom of the hole of
plug .
NOTICE
For details of the oil to use, see "20. USE OF FUEL, COOLANT
AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE".
4. Install plug and plug .
5. Install the cover.
WARNING