Start-up
30
Pos: 16.17 /Übersc hriften/Überschrif ten 2/F-J/G elenkwelle montier en @ 2\mo d_120239834 2788_78.docx @ 5 9253 @ 22 @ 1
6.3 Install the PTO shaft
Pos: 16.18 /BA/I nbetriebnahme/ EasyCut/Anbau Gelenkwelle/Anb au Gelenkwelle @ 3\mod_12047 02102883_78. docx @ 71462 @ @ 1
AFA-0-005
2
1
Fig. 12
• Swivel the PTO shaft bracket under the Weiste triangle
• Push the PTO shaft (1) onto the front PTO shaft of the tractor and secure
• Secure the PTO shaft guard against turning with the retaining chain (2).