EasyManuals Logo
Home>Lennox>Industrial Equipment>G21Q Series

Lennox G21Q Series Unit Information

Lennox G21Q Series
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #57 background imageLoading...
Page #57 background image
Page 57
VII − TROUBLESHOOTING FLOWCHARTS
IGNITION CONTROL CHECKOUT GC1
REPLACE
GC1 CONTROL
APPLY THERMOSTAT DEMAND
AND ALLOW UNIT TO IGNITE
AND ESTABLISH FLAME.
DOES THE CONTROL HALT OPERATION AND
LED LIGHTS IMMEDIATELY AFTER THE TRIAL
FOR IGNITION (WAIT 2 MINUTES TO MAKE SURE
UNIT IS OUT OF POST  PURGE
NO YES
TURN OFF UNIT POWER AT DISCONNECT
FOR AT LEAST 3 SECONDS, THEN TURN
POWER BACK ON. ALLOW 3 SECONDS
FOR CONTROL TO POWER−UP.
IS RED DIAGNOSTIC
LED LIT?
UNIT WAS
IN LOCKOUT
LIT
YES
CONTROL SHOULD OPERATE
PROPERLY PROCEED TO UNIT
WILL NOT RUN"−GAS CHECKS
AND SPARK CHECKS TO RULE
OUT OTHER POSSIBILITIES.
NO
CONTROL SHOULD OPERATE
PROPERLY PROCEED TO
ELECTRICAL CHECKOUT.
NOT LIT
REPLACE GC1
CONTROL
START HERE
IS RED DIAGNOSTIC
LED LIT?

Table of Contents

Other manuals for Lennox G21Q Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox G21Q Series and is the answer not in the manual?

Lennox G21Q Series Specifications

General IconGeneral
BrandLennox
ModelG21Q Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals