Maintenance
110 MTS Landmark™ Tabletop Load Units - Product Information
Check the Precharge Pressure
1. Connect the charging kit chuck valve to the accumulator valve stem.
Item Description
1 Locknut
2 Valve Stem
3 Close
4 Open
5 Poppet Type Accumulator Valve. To open and close, use locknut.
6 Or
7 Valve Core
8 Core type accumulator valve. To open and close use chuck valve.
9 THESE ITEMS SUPPLIED BY USER
10 Nitrogen Bottle Valve
Checking the Precharge Pressure