x
TABLEOFCONTENTS
INTRODUCTION iii
1
HANDLING PRECAUTIONS 1
2
PRECAUTIONS REGARDING INSTALLATION 4
3 PRECAUTIONS REGARDING OPERATION 7
4 PART DESCRIPTIONS 10
5 ACCESSORIES 11
6 ASSEMBLY AND INSTALLATION 12
6-1 INSTALLING THE CABINET 13
6-2 FIXATION TO SITE 17
6-3 POWER SUPPLY AND OTHER CONNECTIONS 19
6-4 TURNING ON THE POWER 20
6-5 CONFIRMATION OF ASSEMBLY 22
6-6 APPLYING WARNING LABELS (EPILEPTIFORM SEIZURES) 23
7 PRECAUTIONS WHEN MOVING THE MACHINE 24
7-1 PRECAUTIONS WHEN MOVING FROM SITE 25
8 GAME DESCRIPTION 26
8-1 HOW TO PLAY 26
9 EXPLANATION OF TEST AND DATA DISPLAY 33
9-1 SWITCH UNIT AND COIN METER. 34
9-2 SYSTEM TEST MODE 35
9-3 SYSTEM INFORMATION 37
9-4 STORAGE INFORMATION 39
9-5 JVS TEST 41
9-6 MONITOR TEST 44
9-7 SPEAKER TEST 45
9-8 COIN ASSIGNMENTS 46
9-9 CLOCK SETTING 52
9-10 NETWORK SETTING 54
9-11 GAME TEST MENU 58
9-12 BOOKKEEPING 59
9-13 INPUT TEST 64
9-14 OUTPUT TEST 65
9-15 TICKET TEST 66
9-16 GAME ASSIGNMENTS 67
9-17 TICKET SETTINGS 69
9-18 BONUS SETTINGS 70
9-19 DIFFICULTY SETTINGS 71
9-20 BACKUP DATA CLEAR 72
9-21 TICKET ERROR 73