4 Commissioning
4.1 General Information
SIP ART DR24 6DR2410
C79000-G7476-C153-03
167
4 Commissioning
4.1 General In fo rmation
The procedure for commissioning and testing depends on the function of the user program *),
therefore only general hints can be given here.
Instructions for optimizing the controller function can be found in chapter 1.5.7, page 42,
blocks h (controller).
4.2 Test
We recommend you to configure manual setting modes and fully exploit the display possibilities
which may only be utilizable for commissioning. We recommend you to proceed section by sec-
tion for testing a configured user program. This can be achieved by nPoS gaps in the position-
ing sequence (see chapter 3.3.8, page 159). Displays or analog outputs or LEDs or digital out-
puts must then be connected in the meantime at the respective end of the section. The
necessary measuring results can also be achieved by connecting switching functions of the dis-
plays and LEDs which are only activated during the test phase.
To test the SIPART DR24 hardware, simple connections are chosen by connecting inputs and
outputs with each other for example and using displays and LEDs for displaying or signaling.
*) No user program is stored when delivered (factory setting)!