Electrical Connection
Turn on the Load breaker and EPS(Off-grid) breaker.
Turn on the battery breaker.
Make sure the battery is well connected.
Make sure the CT or Meter is wellconnected.
Confirm that all DC lines and AC lines are connected.
Make sure that the inverter is fixed on the wall.
Ensure that all ground wires are grounded.
6.8 Check All Below Steps Before Starting Inverter
Electrical Connection
Please check the WiFi Dongle user manual/LAN Dongle user manual
/4G Dongle user manual.
Step 2. Plug WiFi Dongle into the DONGLE port.
72
73
N
BAT
Battery
N-BAR for loads
N-BAR for EPS(Off-grid) loads
EPS(Off-grid) loads
Loads
Inverter
PV 1
PV 2
E-BAR
RCD
Breaker
Grid
Breaker
Grid
EPS(Off-grid)
Main Breaker
Breaker
Breaker
CT
CT
Breaker
PE
RCD
Long press the “Enter “key for 5 seconds to exit the Off mode.
(The mode is factory defaulted as Off Mode)
Ø After the inverter is checked, then conduct the following steps
U
pgr
ad
e
/D
o
n
g
l
e
8
Turn on the DC switch.