24 CG-SVX17D-EN
Pre-Installation
Installation Requirements
A list of the contractor responsibilities typically associated with the unit installation process is
provided.
Type of
Requirement
Trane Supplied
Trane Installed
Trane Supplied
Field Installed
Field Supplied
Field Installed
Foundation • Meet foundation requirements
Rigging
• Safety chains
• Clevis connectors
•Lifting beam
Isolation
• Elastomeric isolators
(optional)
• Elastomeric isolators (optional)
Electrical
•Circuit breakers
(optional)
• Unit mounted starter
• Circuit breakers (optional)
• Electrical connections to unit mounted starter
• Wiring sizes per submittal and NEC
• Terminal lugs
• Ground connection(s)
• BAS wiring (optional)
• Control voltage wiring
• Chilled water pump contactor and wiring including interlock
• Option relays and wiring
Water piping
• Flow switch
• Water strainer
• Taps for thermometers and gauges
• Thermometers
• Water flow pressure gauges
• Isolation and balancing valves in water piping
• Vents and drain
• Pressure relief valves
Insulation
• Insulation
• High humidity
insulation (optional)
•Insulation
Water Piping
Connection
Components
•Grooved pipe
Other Materials
• R-410A refrigerant (1
lb. maximum per
machine as needed)
• Dry nitrogen (20 psig
maximum per
machine as needed)