3 - 14
CHK
ADJ
ADJUSTING THE VALVE CLEARANCE/
SYNCHRONIZING THE THROTTLE BODIES
g. Measure the valve clearance again.
h. If the valve clearance is still out of
specification, repeat all of the valve
clearance adjustment steps until the
specified clearance is obtained.
▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲ ▲
8. Install:
• all removed parts
NOTE:
For installation, reverse the removal
procedure. Note the following points.
SYNCHRONIZING THE THROTTLE BODIES
NOTE:
Prior to synchronizing the throttle
bodies, the valve clearance and the
engine idling speed should be properly
adjusted and the ignition timing should
be checked.
1. Stand the motorcycle on a level surface.
NOTE:
Place the motorcycle on a suitable
stand.
2. Remove:
• fuel tank
Refer to “FUEL TANK AND AIR FIL-
TER”.
• bottom cowling
• front cowling
Refer to “COWLINGS”.
3. Remove:
• bolts 1
• copper washers
11