EasyManuals Logo
Home>Atag>Boiler>i Series

Atag i Series Technical Guide

Atag i Series
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
Make sure before the boiler is put into operation that the boiler and installation have been fully vented. Vent the gas line and open the gas isolation
valve to the boiler. The boiler requires no adjustment of the burner pressure and quantity as it has been set in the factory and should not be reset.
Commissioning the boiler
Turn on the boiler
electrical supply.
After filling the 7 minute air purge program
starts;
Device discovery...
14.09.18
Airpurge active
1.7 bar
19°25/07/18 09:00
860°
ECO AUTO
DHW Active
1.1 bar
19°25/07/18 09:00
80°60°
ECO AUTO
DHW Active
1.1 bar
1
Vent the entire heating installation
starting at the lowest point;
4
When the boiler starts up for the first time
the following screens will be shown:
Initializing...
14.09.18
2
Check the water pressure and top up if
necessary to 1.0 – 1.2 bar;
5
3
17

Other manuals for Atag i Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag i Series and is the answer not in the manual?

Atag i Series Specifications

General IconGeneral
BrandAtag
Modeli Series
CategoryBoiler
LanguageEnglish

Related product manuals