EasyManuals Logo
Home>Atag>Boiler>i Series

Atag i Series Technical Guide

Atag i Series
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
Ignition electrode
Replacing the ignition electrode is necessary when the pins are worn.
If the inspection hole is damaged, the entire ignition electrode has to be replaced.
It is replaced as follows:
Take away the plug connections on the ignition electrode
Push the clip on top of the electrode upwards and take away the electrode
Remove and replace the gasket
Reassembly takes place in reverse order.
ALWAYS REPLACE THE GASKETS OF THE REMOVED PARTS DURING MAINTENANCE.
Put the boiler back into operation and carry out a flue gas analysis.
ALWAYS PUT BACK THE COVER AFTER MAINTENANCE WORK AND SECURE IT WITH SCREWS A AND B.
AFTER SERVICING, COMPLETE THE RELEVANT SERVICE INTERVAL RECORD SECTION OF THE
BENCHMARK CHECKLIST LOCATED ON THE INSIDE BACK PAGE OF THE INSTALLATION AND
SERVICING INSTRUCTIONS.
!
!
!
A
B
61

Other manuals for Atag i Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag i Series and is the answer not in the manual?

Atag i Series Specifications

General IconGeneral
BrandAtag
Modeli Series
CategoryBoiler
LanguageEnglish

Related product manuals