Figure 81: Cabling a 40-Gigabit QSFP+ or QSFP28 Transceiver Module
What to do next
Route the fiber-optic cables through the Supervisor PIC cable management bracket and chassis-mounted
fiber/cable routing guide.
Using the DTI Ports on the Supervisor PIC
Before you begin
• Install the Supervisor PIC.
• Install the Supervisor Card.
Required Tools and Equipment
• RJ-45 cable
• Clock source (DTI server)
Step 1 Connect one end of the RJ-45 cable to the DTI port on the Supervisor PIC.
Figure 82: DTI Port Connection on the Supervisor PIC
Cisco Converged Broadband Routers Hardware Installation Guide
120
Installing the Supervisor in the Cisco cBR Chassis
Using the DTI Ports on the Supervisor PIC