CRUSHING HAZARD
Take care of crushing hazard when closing the analyzer front door!
Keep out of the closing area between enclosure cover and base!
2.7 Installation - Electrical
EXPLOSION HAZARD
Before completing the electrical connection of the instrument, verify cables
are inserted and connected in correct manner!
Ensure the earthing conductor (protective earth; PE) is connected!
When all connections are correctly made and
checked,
• close the front panel and secure it with
the fasteners.
2.7.1 External Equipotential Bonding Connector
The instrument provides a thread (metric M5)
right beside the power cable inlet, to connect
an equipotential bonding conductor.
The installation has to comply with sound
engineering practice (for an example see Fig.
2-11). Consider formation of contact corrosion
and take measures to avoid this!