This step is only required when upgrading or replacing non-hot-plug
components.
â–¶
Inform the system administrator that the server will be shut down and put
offline.
â–¶
T
erminate all applications.
â–¶
Perform the required procedures described in the preliminary steps of each
upgrade or maintenance task.
â–¶
Shut down the server.
If the system is running an ACPI-compliant operating system (OS),
pressing the On/Off button will perform a graceful shutdown.
â–¶
Switch on the ID indicator on the front panel and I/O panel of the server, see
"Locating the defective server" on page 43.
4.3 Disconnecting the power cord
Standard power supply
Figure 2: Unlocking the cable tie of a standard PSU
Basic hardware procedures
46 Upgrade and Maintenance Manual RX1330 M4