EasyManuals Logo

Gambro AK 98 Service Manual

Gambro AK 98
276 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
28 AK 98™ Dialysis Machine - AK 98™ Installation guide
HCEN12630 Revision 07.2015
Program version 1.xx
2.2.14 Step 14 - Remote panel, RP 98 (option)
2.2.14.1 About RP 98
Figure 2-12. RP 98 - installation
WARNING!
If a remote Operator's Panel has been installed, fluid bags shall be removed from
the infusion stand when transporting (moving) the machine to avoid overbalance.
The fluid bags may be placed on the top tray.
NOTE!
The AK 98 dialysis machine is prepared for installation of the RP 98 remote panel,
either on the left or the right side of the machine.
2.2.14.2 Prepare
Procedure
1) Remove the plastic plug, 100316359, according to Figure 2-13 “Preparation” on
page29.
2) Remove the four screws, 100378406, according to Figure 2-13 “Preparation” on
page29.
3)
Remove the cover according to Figure 2-13 “Preparation” on page29.

Table of Contents

Other manuals for Gambro AK 98

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gambro AK 98 and is the answer not in the manual?

Gambro AK 98 Specifications

General IconGeneral
BrandGambro
ModelAK 98
CategoryMedical Equipment
LanguageEnglish

Related product manuals