184 AK 98™ Dialysis Machine - Maintenance manual
HCEN12630 Revision 07.2015
Program version 1.xx
2) Remove the two screws (4).
3) Move the rear cover (2) backwards.
8.1.2.3 How to remove the Blood Monitor (BM)
Procedure
1) Remove the two screws (1).
2) Remove the two screws (5).
3) Move the BM (3) forwards.
8.2 Test equipment
Test equipment Tolerance Manufacturer Gambro order
number
Conductivity
measurement
±0.1 mS/cm MESA, IBP N/A
Pressure
measurement
±2 mmHg to ±200
mmHg
MESA, IBP, Druck N/A
Teperature
measurement
±0.2°C MESA, IBP N/A
Digital voltmeter ±0.5% Fluke N/A
Meassuring glass ±5 ml N/A N/A
Blood leak Calibration
cover
N/A Gambro K40420002
Gauge pin kit for blood
pump rollers (including
three different pins)
T = 1.1 (Stop pin =
1.1*2*0.7 = 1.5 mm)
T = 1.6 (Stop
pin=1.6*2*0.7 = 2.2
mm)
T = 2.0 (Stop pin =
2.0*2*0.7 = 2.2 mm)
T = wall thickness of
blood tubing
Gambro K40158001
Calibration tube kit N/A Gambro K13983002
Drip chamber N/A N/A N/A
Tuber for calibration of
priming detector
N/A N/A N/A
Safety tester According to IEC
60601-1
Rigel, Biotec, Metron,
Fluke
N/A
*BPM test equipment N/A Gambro K22151001
Magnet for blood
pump cover
N/A Gambro K19049001
* If installed
Table 8-1. Test equipment needed to perform maintenance
8.3 Water inlet tube disinfection
Before you begin
The water inlet tube between the water supply system and the tube into the AK 98
dialysis machine up to the recirculation valve (REVA) is not automatically disinfected