HCEN12630 Revision 07.2015
Program version 1.xx
AK 98™ Dialysis Machine - AK 98™ Installation guide 43
2.8 Installation checklist
Machine identification
Product code
Serial number
Table 2-4. Machine
Description Performed
Step 1 - Unpacking the machine: no shipping damage □
Step 2 - Inspection of delivered equipment □
Step 3 - Remove the machine from the pallet □
Step 4 - Additional package box □
Step 5 - Dialyzer connector set, red □
Step 6 - Dialyzer connector set, blue □
Step 7 - Transportation handle □
Step 8 - Pick-up tube holder □
Step 9 - Ultrafilter (option) □
Step 10 - Dialyzer holder □
Step 11 - Top tray □
Step 12 - BPM: cuff holder and cuff (option) □
Step 13 - Infusion stand □
Step 14 - Remote panel, RP 98 (option) □
Step 15 - Water supply □
Step 16 - Drain □
Step 17 - Suction tube for chemical intake □
Step 18 - Potential equalization connector □
Step 19 - Power supply □
Step 19 - Power supply, instructions for home installation □
Step 20 - Placement of warning labels □
Initial start-up procedure □
Service reporting - installation □
Table 2-5. Checklist
Date Signature
Table 2-6. Performed by
This record is to be signed and filed by the Service Engineer responsible for the initial
installation and start-up procedure of this AK 98 dialysis machine.