EasyManuals Logo
Home>GE>Measuring Instruments>Moisture Target Series 6

GE Moisture Target Series 6 User Manual

GE Moisture Target Series 6
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
Chapter 3. Operation and Programming
Moisture Target Series 6 Hygrometer User’s Manual 51
3.5.3 Managing Log Files
To manage the log file status, from the
Logging Menu select Manage and press
Enter . If no log has been created, the
following screen appears.
3.5.3a Creating a New Log
Note: In order for the new log option to be available, there can be no log
running or paused. If there is any previous log running/paused, it will
need to be closed. Once closed, the closed log file cannot be resumed.
To create a new log, from the Manage Log
Files menu select New Log and press
Enter . A screen similar to the following
appears.
A file name is assigned by the MTS6 to the
new log. This name corresponds to the date
and time the log is started. A log started on
May 1 at 4:37 pm will be named 05011637.
After about 10 seconds, the screen returns to
the Manage Log Files menu.
Note: When a new log is created, the Manage Log Files menu changes to
the following screen.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Moisture Target Series 6 and is the answer not in the manual?

GE Moisture Target Series 6 Specifications

General IconGeneral
BrandGE
ModelMoisture Target Series 6
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals