EasyManuals Logo
Home>Hypertherm>Welding System>HPR130 Manual Gas

Hypertherm HPR130 Manual Gas User Manual

Hypertherm HPR130 Manual Gas
191 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #107 background imageLoading...
Page #107 background image
MAINTENANCE
5-4 HPR130 Manual Gas Instruction Manual
5
Sequence of operation
1. Power-up The system verifies that all of these signals are off at power-up
Coolant flow off
Chopper current off
Transfer off
Phase Loss off
Chopper 1 over-temp off
Magnetics over-temp off
Coolant over-temp off
Plasma start off
2. Purge Air or N
2
gas flows through torch for 20 seconds
Coolant flow on
Contactor closes and the chopper performs a chopper test and a current sensor test
Plasma start off
Contactor opens when the purge cycle ends
3. Idle
Gas pressure ok
Coolant flow on
Chopper current off
Line voltage ok
4. Preflow 2 second flow of gas
5. Pilot Arc Current flow between electrode and nozzle
Chopper, main contactor and pilot arc relay are on
High frequency present
Chopper current sensor = pilot arc current
6. Transfer Pilot arc current sensed on the worklead
7. Ramp-up Chopper current increases to set point and gas switches to cutflow
Coolant flow on
Gas pressure ok
Phase loss on
Line voltage ok
8. Steady State normal operating parameters
Coolant flow on
Gas pressure ok
Phase loss on
Chopper 1 over-temp off
Magnetics over-temp off
Coolant over-temp off
9. Ramp-down Current and gas flow decreases after plasma start has been removed
Cutflow gas off
10. Auto Off 10 second postflow
Main contactors off
Choppers off

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hypertherm HPR130 Manual Gas and is the answer not in the manual?

Hypertherm HPR130 Manual Gas Specifications

General IconGeneral
BrandHypertherm
ModelHPR130 Manual Gas
CategoryWelding System
LanguageEnglish

Related product manuals