EasyManuals Logo
Home>Intel>Server Board>SE7520BD2

Intel SE7520BD2 Technical Product Specification

Intel SE7520BD2
179 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #166 background imageLoading...
Page #166 background image
Environmental Specifications Intel® Server Board SE7520BD2 Technical Product Specification
154 Intel Confidential Revision 1.3
7.5.4 Product Regulatory Compliance Markings
This product is provided with the following Product Certification Markings:
cURus Recognition Mark
CE Mark
Russian GOST Mark
Australian C-Tick Mark
Korean RRL MIC Mark
Taiwan BSMI Certification Number R33025 and BSMI EMC Warning
7.5.5 Electromagnetic Compatibility Notices
7.5.5.1 Europe (CE Declaration of Conformity)
This product has been tested in accordance to, and complies with the Low Voltage Directive
(73/23/EEC) and EMC Directive (89/336/EEC). The product has been marked with the CE Mark
to illustrate its compliance.
7.5.5.2 Australian Communications Authority (ACA) (C-Tick Declaration of
Conformity)
This product has been tested to AS/NZS 3548, and complies with ACA emission requirements.
The product has been marked with the C-Tick Mark to illustrate its compliance.
7.5.5.3 Ministry of Economic Development (New Zealand) Declaration of
Conformity
This product has been tested to AS/NZS 3548, and complies with New Zealand Ministry of
Economic Development emission requirements.
7.5.5.4 BSMI (Taiwan)
The BSMI Certification number R33025 is silk screened on the component side of the server
board, and the following BSMI EMC warning is located on the solder side of the server board.
7.5.6 Replacing the Back up Battery
The lithium battery on the server board powers the real time clock (RTC) for up to 10 years in
the absence of power. When the battery starts to weaken, it loses voltage, and the server
settings stored in CMOS RAM in the RTC (for example, the date and time) may be wrong.
Contact the customer service representative or dealer for a list of approved devices.
WARNING
Danger of explosion if battery is incorrectly replaced. Replace only with the same or equivalent
type recommended by the equipment manufacturer. Discard used batteries according to
manufacturer’s instructions.

Table of Contents

Other manuals for Intel SE7520BD2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Intel SE7520BD2 and is the answer not in the manual?

Intel SE7520BD2 Specifications

General IconGeneral
BrandIntel
ModelSE7520BD2
CategoryServer Board
LanguageEnglish

Related product manuals