EasyManuals Logo
Home>jcb>Other>214

jcb 214 Service Manual

jcb 214
890 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #786 background imageLoading...
Page #786 background image
127 - 14
Section F Transmission
9803/3280
Section F
127 - 14
Issue 1
Powershift Gearbox
11 Fit the Solenoid Control Valve Block
a Fit two guide studs at the valve interface on the front
case. Locate a new valve block sealing gasket 11a as
shown at C. Care is needed as the gasket is thin.
Gearboxes fitted with a sub-base plate have two
gaskets, one each side of the plate.
b Fit the 8 socket head cap screws and washers 11b. The
screws must be progressively torque tightened.
Gradually tighten all the screws to 35 Nm (26 lbf ft).
12 Fit the Main Hydraulic Pump Driveshaft
a Fit a new sealing ring 12a to the shaft 12b. Apply clean
oil to the sealing ring and fit the shaft inside the gearbox.
b Apply clean oil to the ball bearing 12c. Fit the bearing
followed by circlip 12d.
13 Fit the Layshaft Cover
a If applicable fit the layshaft cover 13a. Make sure the
casing mating faces are clean and undamaged. Apply a
thin bead of JCB Multigasket to the rear casing and fit
the cover. Fit bolts 13b and progressively torque tighten
to 56Nm (41 lbf ft).
Note: The main machine hydraulic pump can be fitted at this
stage. However, it is easier to fit the gearbox to the machine
and then fit the pump. See Section E, Main Hydraulic
Pump, Replacement.
www.WorkshopManuals.co.uk
Purchased from www.WorkshopManuals.co.uk

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 214 and is the answer not in the manual?

jcb 214 Specifications

General IconGeneral
Brandjcb
Model214
CategoryOther
LanguageEnglish

Related product manuals