EasyManuals Logo
Home>jcb>Other>217

jcb 217 User Manual

jcb 217
890 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #734 background imageLoading...
Page #734 background image
A395470
If the torque converter housing has been removed,
temporarily replace it. The gearbox can again be positioned
standing on the face of the housing ready for assembly.
Layshaft Assembly
1 Smear bearing surface of shaft with JCB HP Grease
and fit needle roller bearings 1a (wider bearing first),
followed by 2nd gear 1b.
2 Fit the synchro assembly 2, then press fit the bearing
track 3a.
3 Slide 1st gear needle roller bearings 3b over the track.
Smear bearings with oil. Fit 1st gear 3c over needle
roller bearings.
4 Assemble 4WD transfer gear 4 over splines. On 2WD
machines slide spacer over splines.
5 Press bearing 5a and 5b onto the assembled layshaft.
Smear the bearings with JCB HP Grease.
Mainshaft Assembly
6 Smear bearing surface of mainshaft with JCB HP
Grease. Fit the needle roller bearings 6a and 6b.
Assemble 3rd gear 6c and synchro-cup 6d. Fit synchro
gear 6e.
7 Fit spacer washer 7a and oil retention washer 7b. Note
the correct way round of components 7a and 7b. Press
bearing 7c onto shaft and smear with JCB HP Grease.
8 Press bearing onto assembled mainshaft and smear
bearing with JCB HP Grease.
112-2
Section F Transmission
9803/3280
Section F
112-2
Issue 2*
Synchro Shuttle Gearbox
Gearbox - Assembly (cont’d)
4 5a
1b1a
5b
3c3b3a2
7c 7b 7a 6e 6d 6c
6b 6a
8
*
*
www.WorkshopManuals.co.uk
Purchased from www.WorkshopManuals.co.uk

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 217 and is the answer not in the manual?

jcb 217 Specifications

General IconGeneral
Brandjcb
Model217
CategoryOther
LanguageEnglish

Related product manuals