Performance Verification 1-3
Verification test requirements
Be sure that you perform the verification tests:
Under the proper environmental conditions.
After the specified warm-up period.
Using the correct line voltage.
Using the proper calibration equipment.
Using the specified reading limits.
Environmental conditions
Conduct your performance verification procedures in a test environment that has:
An ambient temperature of 18° to 28°C (65° to 82°F).
A relative humidity of less than 80% unless otherwise noted.
Warm-up period
Allow the Model 2700 to warm up for at least two hours before conducting the verification
procedures.
If the instrument has been subjected to temperature extremes (those outside the ranges stated
above), allow additional time for the instrument’s internal temperature to stabilize. Typically,
allow one extra hour to stabilize a unit that is 10°C (18°F) outside the specified temperature
range.
Also, allow the test equipment to warm up for the minimum time specified by the
manufacturer.
Line power
The Model 2700 requires a line voltage of 100V/120V/220V/240V, ±10% and a line
frequency of 45Hz to 66Hz. Note that the line frequency is automatically sensed at power-up,
but the line voltage must be manually set to either 100V/120V or 220V/240V as described in
Section 3.

Table of Contents

Other manuals for Keithley 2700

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keithley 2700 and is the answer not in the manual?

Keithley 2700 Specifications

General IconGeneral
BrandKeithley
Model2700
CategoryMultimeter
LanguageEnglish

Related product manuals