SERVICE WORK ON THE CHASSIS 12
67
(Option: Triple clamp forged)
–
Tighten screws
1
.
Guideline
Screw, top triple
clamp
M8 20 Nm
(14.8 lbf ft)
(Option: Triple clamp milled)
–
Tighten screws
1
.
Guideline
Screw, top triple
clamp
M8 17 Nm
(12.5 lbf ft)
–
Tighten screw
2
.
Guideline
Screw, top steering
stem
M8 20 Nm (14.8 lbf ft)
Finishing work
– Check the steering head bearing for play. ( p. 66)
– Remove the motorcycle from the lift stand. ( p. 59)
12.13 Lubricating the steering head bearing
H02387-01
– Remove the lower triple clamp. ( p. 63)
– Install the lower triple clamp. ( p. 64)
Info
The steering head bearing is cleaned and lubricated in
the course of removal and installation of the lower triple
clamp.
12.14 Removing front fender
Preparatory work
– Remove the headlight mask with the headlight. ( p. 113)
V00340-10
Main work
–
Remove screws
1
.