5 -3
★ First Replacement ● Replacement ▲ Check, Adjustment and Supply ■ Clean up
No. Checking Parts Page No.
Check period (hr)
Daily 50 300 500
1000
or 1-yr
1500
or 2-yr
3000
1 Fuel tank 5-8, 5-21
▲■
2 Fuel filter 5-6, 5-24
■●
3 Engine oil 5-5, 5-7, 5-17
▲★●
4 Engine oil filter 5-5, 5-17
★●
5 Engine coolant 5-9, 5-27
▲●
6 Radiator screen 5-11, 5-14
▲■
7 Air cleaner 5-10, 5-15, 5-26
▲■ ●
8 Battery 5-15, 5-36
▲
9 Fan belt tension 5-20
▲
(First)
▲
10 Valve clearance 5-26
▲
11
EGR Cooler, PCV, Injector
Tips
5-28
■
12
Fuel injector, DOC&DPF,
Turbocharger, ECU, etc
5-29
■
13 Hydraulic oil filter 5-5, 5-18
★●
14 Transmission oil 5-15, 5-23
▲●
15 Front axle oil 5-15, 5-22
▲●
16 Steering cylinder 5-14
▲
17
Front axle holder &
Steering arm
5-14
▲
18 3-Point linkage 5-14
▲
19 Clutch pedal play 5-12
▲
20 Brake pedal play 5-13
▲
21
Turn signal lights,
Lights, Horn
5-9
▲
22
Instrument panel &
Indicators
5-8
▲
23 Bolts and Nuts retighten 5-12
▲
24 Tire air pressure 5-11
▲
25 Toe-in 5-20
▲
26 Cabin air filter 5-16, 5-25
■●
27 Hydraulic hoses 5-16
▲
28 In-line pressure filter 5-20
▲
●