Manitowoc Published 05-16-17, Control # 233-03 5-7
999 SERVICE/MAINTENANCE MANUAL HOISTS
5
Installation
The block-up limit controls must be installed according to
Boom Wiring, Limits and Load Indicator Electrical Assembly
drawing in the 999 Operator Manual.
See Figure 5-7
for installation of the weights.
Storing Electric Cable
The electric cables for the boom, fixed jib, and luffing jib are
long enough to accommodate the maximum length of each
attachment.
Store the excess cable for the boom and luffing jib on the reel
mounted on either butt (Figure 5-5
). The reel is equipped
with a locking pin. Disengage the locking pin to allow the reel
to be wound. Engage the locking pin to lock the reel in
position. The power supply cable to the reel must be
disconnected before the reel can be wound.
Store the excess electric cable for the fixed jib by winding it
around the brackets on the fixed jib butt (Figure 5-5
).
FIGURE 5-4
#82 Boom Point Shown
All Other Boom and
Jib Points Similar
Weight
Lift Block
Weight Ball
Load Block
Limit Switch
Assembly
Upper Boom
Point
Lower Boom
Point
Limit Switch
Assembly
Chain
8 ft (2.4 m)
Chain
6 ft (1.8 m)
Weight
Lift Plates
A873

Table of Contents

Other manuals for Manitowoc 999

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 999 and is the answer not in the manual?

Manitowoc 999 Specifications

General IconGeneral
BrandManitowoc
Model999
CategoryConstruction Equipment
LanguageEnglish

Related product manuals