Installation
3-1
Part 1073401_07
E 2021 Nordson Corporation
Section 3
Installation
WARNING! Allow only personnel with appropriate training and experience to
operate or service the equipment. The use of untrained or inexperienced
personnel to operate or service the equipment can result in injury, including
death, to themselves and others, and damage to the equipment.
Quick‐Start
If you have already installed the melter using the installation guide
(P/N 1024498) that is provided inside the shipping container, and you have
no questions concerning the installation, go to Setting Up the Melter later in
this section for information about how to prepare the melter to operate with
your manufacturing process.
Overview
DuraBlue melters are factory‐configured for each order and require only the
assembly and set up tasks described in this section. If your melter was
ordered as a complete system, the shipping container will also contain one or
more hot melt hoses and applicators.
The melter is shipped from the factory with an installation kit that contains
components that must be assembled on the melter by the customer. Some
additional materials must also be supplied by the customer to complete the
installation.
If optional equipment was ordered with the melter, the documentation
provided with the optional equipment for installation and operating
instructions.
The illustrations accompanying the procedures in this section depict the
D10L melter. Unless otherwise noted, the instructions also apply to the D4L
and D16L melters.