EasyManuals Logo
Home>Polaris>Offroad Vehicle>RZR 570 2013

Polaris RZR 570 2013 Service Manual

Polaris RZR 570 2013
482 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #225 background imageLoading...
Page #225 background image
5
9926813 R04 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.
5.19
NOTE
It is important that the same number and thickness of
washers are reinstalled beneath the spider during
assembly. Be sure to note the number and thickness of
these washers.
2. Inspect the Teflon™ coating on the moveable sheave
bushing.
Moveable Sheave Bushing Inspection:
Replace the cover bushing if more brass than Teflon is
visible on the bushing. Refer to bushing replacement in
this chapter.
ROLLER, PIN, AND THRUST WASHER
INSPECTION
Inspect all rollers, bushings and roller pins by pulling a
flat metal rod across the roller. Turn roller with your
finger. If you notice resistance, galling, or flat spots,
replace rollers, pins and thrust washers in sets of three.
Also inspect to see if roller and bushing are separating.
Bushing must fit tightly in roller. Use the Roller Pin Tool
e
to replace rollers and pins. Take care not to damage
roller bushing or bearing surface of the new pin during
installation.
e
2870910
Roller Pin Tool
BUTTON TO TOWER CLEARANCE
INSPECTION
1. Inspect for any clearance between spider button to
tower. If clearance exists, replace all buttons and
inspect surface of towers.
Button to Tower Clearance:
.000-.012”
PVT SYSTEM

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Polaris RZR 570 2013 and is the answer not in the manual?

Polaris RZR 570 2013 Specifications

General IconGeneral
BrandPolaris
ModelRZR 570 2013
CategoryOffroad Vehicle
LanguageEnglish

Related product manuals