5.2.8 Putting the machine down
Requirements
The following preconditions must be satisfied before setting down the machine at the
installation location:
The mating faces must be clean.
The anti-corrosion protection paint has been removed from the mating faces, such as the
machine mounting feet, flange, ...
There is no condensation present within the machine.
Setting down the machine
Set down the machine slowly and carefully at the installation location to avoid any impact.
See also
Draining condensation (Page 51)
5.2.9 Roughly aligning the machine
Requirement
The transmission element such as a coupling half has already been pulled on.
Roughly aligning the machine
For horizontal positioning, push the motor sideways across the foundation. When doing so,
ensure that the axial position is maintained.
Assembly
5.2 Lift the machine to where it will be installed, and position it
SIMOTICS TN Series N-compact 1LA8
52 Operating Instructions 05/2016

Table of Contents

Other manuals for Siemens 1LA8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens 1LA8 and is the answer not in the manual?

Siemens 1LA8 Specifications

General IconGeneral
BrandSiemens
Model1LA8
CategoryEngine
LanguageEnglish

Related product manuals