&RPPLVVLRQLQJ
S7-300 Automation System, Hardware and Installation: CPU 31xC and CPU 31x
9-22 A5E00105492-03
6. Control the PO via menu item 9DULDEOH!(QDEOHFRQWUROYDOXHV. "Enable PO“
mode remains active until switched off again via 9DULDEOH!(QDEOH32.
"Enable PO" is also terminated when the connection to the PG goes down.
7. Return to step 4 if you want to specify new values.
1RWH
For example, a message pops up to indicate CPU mode transition from STOP
to RUN or START-UP.
A message also pops up indicating that the "Enable PO" function is selected
while the CPU is in RUN mode.
&RPPLVVLRQLQJ352),%86'3
&RPPLVVLRQLQJ352),%86'3
5HTXLUHPHQWV
Requirement for commissioning a PROFIBUS DP network is:
• A PROFIBUS DP network has been created.
• In 67(3, you have configured the PROFIBUS DP network and you have
assigned all network nodes a PROFIBUS DP address and memory area (see
the Manual 6,0$7,&67(39[&RQILJXULQJKDUGZDUHDQGFRQQHFWLRQVZLWK
67(39[).
• Note that you must also set address switches in some of the DP slaves (see the
description of the relevant DP slave).
• Software requirements are shown in the table below, depending on the CPU:
Table 9-6 Software requirements
&38 2UGHU1R 6RIWZDUHUHTXLUHG
313C-2DP 6ES/313-6CE00-0AB0
314C-2DP 6ES7314-6CF00-0AB0
67(3 V 5.1 or later + SP 4
&20352),%86 V 5.0 or later
315-2 DP 6ES7315-2AG10-0AB0 67(3 V 5.1 or later + SP 4
317-2 DP 6ES7317-2EJ10-0AB0 67(3 V 5.2 + SP 1 or later