SIPROTEC, 7RW80, Manual
C53000-G1140-C233-1, Release date 10.2010
139
Mounting and Commissioning 3
This chapter is intended for experienced commissioning staff. He must be familiar with the commissioning of
protection and control systems, the management of power systems and the safety rules and regulations. Hard-
ware adjustments to the power system data might be necessary. The primary tests require the protected object
(line, transformer, etc.) to carry load.
3.1 Mounting and Connections 140
3.2 Checking Connections 155
3.3 Commissioning 159
3.4 Final Preparation of the Device 173