BlueCool S Series 12 Decommissioning
43
12 Decommissioning
If the air-conditioning system is to be decommissioned, e.g.
during the winter, the following procedure must be
complied with:
Switch off the system by pressing the “On/Off” button
.
Disconnect the power supply.
Close all sea water valves.
Completely drain the sea water circuit, i.e. sea water lines,
sea water strainer, sea water pump and condenser, or fill
it with antifreeze.