74 AO2000-LS25 LASER ANALYZERS | OI/AO2000-LS25-EN REV. D
13 Maintenance
Introduction
The analyzer is designed to reduce the maintenance required to
a minimum.
Experience has shown that maintenance interval of more than
three months are acceptable for most applications.
The maintenance operations described in this section will secure
a continuous and safe operation of the monitor.
a
Maintenance plan
ABB gas monitors have no moving parts and require no
consumables.
For best performance, however, routinely carrying out the
follows steps is recommended:
Check optical transmission regularly (daily). This can be
done automatically by use of instrument output (if
ordered).
Clean windows and adjust alignment when necessary, see
Cleaning of optical windows on page 75.
For applications whose concentration of the sample gas
is usually zero (“zero point gas” application):
Check the device reaction by supplying a sample gas.
Ensure that a sufficient amount or concentration is
applied in order to detect a device reaction or
measured value change for at least 10 minutes.
No warnings or errors should be displayed during the
test.
For certain devices this procedure is not necessary as
the laser is tracking on another absorption line than
the “zero gas” line (e.g. H
2
O line for an HF device).
Contact ABB Service if you are in doubt about your
device.
Check calibration every 3 to 12 months (depending on the
required accuracy). Recalibrate if necessary, see
Calibration of the device on page 76.
After each calibration check, save device settings and
measurement data recorded with some gas, see File
download / upload <File download / upload> on
page 65.
This is for tracking purposes in case of future service
issues.
Carry out maintenance activities
Opening and closing the housing
This housing contains a 3 V lithium battery.
Observe the following safety instructions when opening and
closing the housing with the type of protection Ex “p
pressurized enclosure:
DANGER
Explosion hazard
There is a risk of explosion if the housing is opened in a
hazardous atmosphere.
Before opening the housing:
A valid fire permit must be present.
Make sure that there is no explosion hazard.
Before opening the housing, switch off the power supply.
WARNING
Risk of suffocation
Risk of suffocation when using inert purging gases such as
nitrogen (N
2
).
Before opening the housing, switch off the housing
purging.
Recommissioning after opening the housing
Before closing the housing and recommissioning, all dust
deposits in and on the device must be removed.
After closing the housing, the power supply must not be
restored until an initial purge duration of at least 3 minutes
at 20 l/min has elapsed.
Only original spare parts must be used to seal the housing.
Replacement of the lithium battery
The lithium battery may only be replaced by ABB Service.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB AO2000-LS25 and is the answer not in the manual?

ABB AO2000-LS25 Specifications

General IconGeneral
BrandABB
ModelAO2000-LS25
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals