EasyManuals Logo
Home>Daikin>Air Conditioner>Super multi NX E Series

Daikin Super multi NX E Series User Manual

Daikin Super multi NX E Series
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #253 background imageLoading...
Page #253 background image
SiBE121135_A Pump Down Operation
Trial Operation and Field Settings 242
1. Pump Down Operation
Outline In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Detail 1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 243 for forced operation.
Gas stop valve
Close
Liquid stop valve
Valve caps
Hexagonal wrench
(R14566)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin Super multi NX E Series and is the answer not in the manual?

Daikin Super multi NX E Series Specifications

General IconGeneral
BrandDaikin
ModelSuper multi NX E Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals