73
Installation and Operation Manual for Inverter RPI M50A_12s V1 EU EN 2017-03-09
7 Commissioning
7. Commissioning
To perform the commissioning steps described
in this section the inverter must be supplied with
either AC power (grid) or DC power at both DC
inputs (solar modules).
1. Turn the AC/DC disconnector to the ON position.
Deutsch
English
2. Use the and buttons to select the English language and then press the
ENT
button.
FRA-Is 50HZ
FRA-Is 60HZ
3. Use the and buttons to select your country or grid type and then press the
ENT
button.
Country Available grids Description
Belgium
BELGIUM
Synergrid C10/11 (July 2012)
Germany
GERMANY LV
Germany VDE-AR-N 4105
GERMANY MV
Germany BDEW
Austria
AUSTRIA
ÖNORM E8001-4-712 + A1:
04/2014
Switzerland
SWITZERLAND
Germany VDE-AR-N 4105
Yes / No
UK G59-3 230
set country:
Are you sure to
4. Check that the correct country or grid type is selected.
If the correct country is selected, use the
and buttons to select the Yes entry
and the press the
ENT
button.
To change the selection, press the
EXIT
button.
→ The inverter starts a self-test lasting approx. 2 minutes. The remaining time is
shown on the display.
ID=001
Setting ID:
NOTICE
If multiple inverters are connected to the PV system then a different inverter ID must set for
each inverter. For example, the inverter ID is used by monitoring systems to uniquely iden-
tify each inverter.
5. Use the and buttons to set the individual digits, choose English and then
press the
ENT
button.