2018112-003 Rev J eBike, eBike L, eBike EL - 5 -
A-2.3 Final Checkout Procedure and Functional Test of eBike EL
1. Visually inspect the device
- Inspect coat of lacquer, cables/power cord, bellows on steering column and saddle.
- Inspect footboard for stability.
- Inspect cuff, tubing and tubing connection.
- Inspect couch adjustment motor for damage.
- Check the setup for stability, lock castor brakes, if required.
- Inspect outrigger.
Expected result: No damage, instability or wear detected Pass/Fail
2. Check rests, cranks, pedals and Velcro strips
- Check that all clamping levers and star grips are firmly seated.
- Check that cranks, pedals, Velcro strips and pedal shoes are properly fixed.
- Fold down drop section.
- Inspect leg rests and their attachment, if leg rests are installed.
- Adjust and inspect hip support.
- Inspect head and arm rests as well as handgrips.
- Grease the threads of the clamping levers (every 6 months, depending on application purpose).
Expected result: All threads properly greased, cranks, rests and pedals OK Pass/Fail
3. Power on
- Using the power cord, connect the device to the power line and turn it on with the power switch.
- Wait for self-test to end: Check LCD, e.g. for error messages.
- Check in the software if the firmware version is OK.
Expected result: Device powers on without errors and FW is OK Pass/Fail
A: Final Checkout Procedure / Functional Test
6. Speed and Noise
- Check speed indication on LCD and additional speed indication for test subject.
- Check noise level of idling drive unit (e.g., for grinding noises or noise from the bearing).
Expected result: Speed displayed on both displays and no noticeable noise Pass/Fail
7. NIBP module (if applicable)
- Check blood pressure measurement on test subject at rest.
- Check blood pressure readings on LCD.
Expected result: BP values are displayed and in proper range Pass/Fail
8. Exercise test
- Start manual exercise test, e.g. initial load of 50 Watts / load change of 25 Watts.
- Check load level and load indication.
Expected result: Load changes as expected Pass/Fail
9. Communication (if applicable)
- If ergometer is remote-controlled from EKG unit or PC-ECG system, check connection cable.
- Check load control vial EKG unit or PC ECG system.
- Check remote start if applicable.
Expected result: Ergometer can be controlled by external unit Pass/Fail