GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Chapter 1 - Position Subsystems Page 63
1 – Pos. Subsystems
Section 10.0 Table Installation (Lite Table)
10.1 Time and Personnel
10.2 Tools and Test Equipment
• Standard Install Tool Kit
• 3/4", 1-1/4", 1-1/2" and 1-5/8" sockets
• 8mm, 10mm, and 14mm hex socket bits
• Laser Alignment kit
• Johnson Professional 6" level
• Johnson Professional 4’ level
• Johnson Professional 2’ level
10.3 Procedures
10.3.1 Draw Table Reference Lines
1.) Draw a reference line of 564mm position from Gantry Base on the floor as shown in the
Figure 1-38.
Figure 1-38 Draw Reference Line
Required Persons Preliminary Reqs Procedure Finalization
2 (FE or mechanical supplier) 1.5 hours labor on-site
564 mm
Draw this line on the floor.
Table Base
Gantry Base