Installation
188 811390 Operator Manual DynaMAX 550P/560P/575P Waterjet Pump
Buyer responsibilities
The buyer is responsible for these obligations.
Cooperate with Hypertherm and the Hypertherm original equipment manufacturer(OEM)
regarding the installation of the equipment.
Obey all setup and first-time start up instructions in this manual.
Research and obey all local codes, including requirements for waste water disposal.
Install high-pressure tubing.
Install water-treatment equipment before the pump is installed.
Make sure that all utilities are available during installation. The site must have sufficient
electrical power, air, water, and drain access.
Make all connections to the pump.
Fill the hydraulic fluid tank.
Perform user qualification and training. Refer to User qualification and training on page 20.
Use SAE tools for most procedures.
Keep the work area clean and dry. Clean fluid spills immediately. Use catch basins under areas
where water or hydraulic fluid can spill during maintenance or repair procedures.
WARNING
Use supports for plumbing to prevent damage to plumbing from bending stress and fatigue
from vibration.
WARNING
This pump can supply water pressure of up to4,140bar(60,000psi).
Only use tubing that is rated for this pressure.