EasyManuals Logo
Home>IBM>Server>Power System E950 9040-MR9

IBM Power System E950 9040-MR9 User Manual

IBM Power System E950 9040-MR9
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
Figure 2. Installing the lift handles
2. Align the holes in the lift handles with the six pins on the chassis, and then lift the handle up (B), until
the latches click into place.
Note: Ensure that all six pins are secured.
3. Repeat these steps for all six lift handles.
Installing the server into a rack
You must remove system chassis components so that a minimum of three people can lift it into the rack.
Install the mounting hardware rst, then remove components from the system chassis, and then lift the
chassis into place.
Note: You must also attach the system-to-rail locking clips to each rail after placing the system onto the
rails.
The following table lists the removal tasks you must perform so that you can lift the system and install it
into the rack. The number of tasks you must perform is dependent on the number of people you have to
install the rack.
Number of installers
Required removal tasks
3
System fans
Front cover
Power supplies
PCIe adapters
Installing the IBM Power System E950 (9040-MR9) 3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power System E950 9040-MR9 and is the answer not in the manual?

IBM Power System E950 9040-MR9 Specifications

General IconGeneral
BrandIBM
ModelPower System E950 9040-MR9
CategoryServer
LanguageEnglish

Related product manuals