c. While holding the blue latch (A), rotate the clip (B) into the rail until it clicks into place.
Figure 15. Installing the clip onto the rail
d. Ensure that the clip (C) is flush with the rail and that the system chassis pin is seated in the clip, as
shown in the following gure.
e. Release the blue latch (D).
16
Power Systems: Installing the IBM Power System E950 (9040-MR9)