A388310
30 - 1
Removing and Replacing
When Removing
Before removing propshafts always mark both companion
flanges and also mark the sliding joints prior to removal.
When Replacing
Upon assembly, after lubricating sliding joints with JCB MPL
Grease, align the shafts against identification marks
previously made or, in the case of a shaft being renewed,
use the manufacturer's alignment markings.
Retaining straps C stretch with use, therefore these straps
must always be replaced with new ones.
Apply JCB Threadlocker and Sealer to threads of all flange
bolts.
Note: Propshafts should be installed with their main shaft
sections fitted to the axle end, and their sliding sections
fitted to the transmission 4 wheel drive unit.
The propshaft must have both ends exactly on the same
plane as shown at X. The yokes must not be at right angles
as at Y or at an intermediate angle as at Z.
Torque Settings
Item Nm kgf m lbf ft
1 21 2.1 15
2 40 - 48 4.08 - 4.90 29.5 - 35.4
Section F Transmission
9803/7130
Section F
30 - 1
Issue 1
Propshafts
ZZ
YY
XX
S189610
22
CC
11
www.WorkshopManuals.co.uk
Purchased from www.WorkshopManuals.co.uk
www.maskinisten.net

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 2CX and is the answer not in the manual?

jcb 2CX Specifications

General IconGeneral
Brandjcb
Model2CX
CategoryFront End Loaders
LanguageEnglish

Related product manuals