EasyManuals Logo
Home>jcb>Compact Loader>4CX

jcb 4CX Service Manual

jcb 4CX
890 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #636 background imageLoading...
Page #636 background image
57 - 1
Synchro Shuttle Gearbox
Forward/Reverse Solenoid Control Valve
Dismantling
Unscrew the knurled nut 2 and remove 'O' ring 3, withdraw
the solenoid 4 and 'O' ring 5.
Hold the solenoid valve body 6 in a vice, using the spanner
flats A, remove spindle 7 and 'O' ring 8.
Pull out actuating pin 9, spring 10, spring retainer 11, and
spool 12.
Inspect the spool and spool bore for signs of wear, nicks
scratches etc.
Assembling
Assembly is reversal of the dismantle procedure.
Renew all 'O' rings.
Lightly lubricate all parts with clean transmission fluid before
assembling.
Check that the flying leads are secure and that the
connectors are intact.
Torque Settings
Item Nm kgf m lbf ft
2 10 to 15 1 to 1.5 8 to 10
Section F Transmission
9803/3280
Section F
57 - 1
Issue 1
Service Procedures
www.WorkshopManuals.co.uk
Purchased from www.WorkshopManuals.co.uk

Table of Contents

Other manuals for jcb 4CX

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 4CX and is the answer not in the manual?

jcb 4CX Specifications

General IconGeneral
Brandjcb
Model4CX
CategoryCompact Loader
LanguageEnglish

Related product manuals