EasyManuals Logo
Home>Polaris>Offroad Vehicle>A09BG50AA

Polaris A09BG50AA User Manual

Polaris A09BG50AA
256 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #170 background imageLoading...
Page #170 background image
FINAL DRIVE
7.12
theboot kit. DO NOT usea substitutegrease and DO
NOT overfill or underfill the CV joint.
9. Slide the new clamp and boot (small end first)
overthesplinedshaft, thenslide (tap)theCVjoint
into the splines of the axle. Install small boot
clamp.
10. Add grease through large end of boot.
11. Position large end of boot on CV joint, purge
excess air by partially compressing axle into CV
bell, lift one edge of boot to let out excess air
Secure with
clamp.
Boot Replacement requires 30g
Boot replacement with complete CV
joint cleaning requires an additional
30g. (Total 60g)
CV Boot Clamp Pliers:
Earless Type (PN 8700226)
CV Joint Grease - 30g (PN 1350046)
FRONT SHAFT
Joint Capacity
30 Grams
Boot Capacity
30 Grams
Front outboard joint capacity: 30g if boot
is replaced only. Another 30g (60g total) if
joint is cleaned.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Polaris A09BG50AA and is the answer not in the manual?

Polaris A09BG50AA Specifications

General IconGeneral
BrandPolaris
ModelA09BG50AA
CategoryOffroad Vehicle
LanguageEnglish

Related product manuals