4-46 Samsung Electronics
4-4 Appropriate Measures for Different Symptom
4-4-1 Outdoor Unit Operation Flow
Commissioning if it is not running - UP is displayed
Prior to star ting the air conditioning operation af ter the ini-
tial installation and automatic commissioning is carried out.
This process, the stable operation to protect the system and verify
the defect of the product.
1. Tracking is complete and after the initial install
ation, if you do
not have a history of commissioning is completed, UP will be dis-
played.
2. Execute the automatic commissioning by Tact Switch.
3. UP display disappears after commissioning is complete, normal
operation is possible.
4. Automatic commissioning is comp
leted, if there is a history, nor-
mal operation execution immediately.
No
Yes
Was commissioning completed?
Power On
Normal operation
LED display the UP(Unprepared)
Automatic commissioning carried out.
When commissioning is complete,
the UP display disappears.

Table of Contents

Other manuals for Samsung AM160FNBFGB/EU

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Samsung AM160FNBFGB/EU and is the answer not in the manual?

Samsung AM160FNBFGB/EU Specifications

General IconGeneral
BrandSamsung
ModelAM160FNBFGB/EU
CategoryHeat Pump
LanguageEnglish

Related product manuals